In the fall of 2010 the renovation of the south shower house began. The old open stall with shower curtain toilets and showers were replaced with individual stalls with lockable doors. A maintenance access was also installed to allow easy access to all of the plumbing. To cap it off Troop 40 lead by Don Declerk replaced the roof with a metal roof at the Spring 2011 Beaver Days.