#67) 2006 – Main Camp Road Improvements

This slideshow requires JavaScript.

In 2006 the Main Camp Road got a major upgrade. These improvements were  spearheaded by Mark Crane, the founder of Mark’s Pizzeria. After re-grading of the road a geotextile fabric was laid down to keep the gravel from sinking into the mud. Then gravel was laid down all the way from the main entrance to the dining hall. Larger stones were place in and around ditches to help control erosion of the banks. The Road was built in memory of Jeffrey Crane who passed away around the time the road was installed. Please “Like” Mark’s Pizzerea on Face book (http://www.facebook.com/MarksPizzeria#!/MarksPizzeria) if you enjoy the new camp road.

This entry was posted in Historic. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s